香蕉app安卓

Products

Location: Home > Products
Pull leveler hydraulic system

◆Process requirements:

Material: carbon steel

Raw material specification: 0.25~1.2×600(mm)

Pull straightening speed: 150m/min (maximum speed)

Roll weight: 6T

Pull correction: 0.25 ~ 1.2 (mm)

◆ Equipment composition:

 

(1) 700(mm) double pull leveler (reinforced)

1. Pull straightening machine work roll φ45×700(mm);

2, with electric pressure, electric pressure;

3, transmission form (no power)

(2) Front power double roller S roller;

1, roller light × roller length φ600 × 700 (mm)

2, gear box

3, DC motor: Z4-180-41 55KW one Z4-180-41 45KW one

4, S roll surface coating material: neoprene. Coating thickness more than 10mm.

(3) Rear power double roller S roller:

1, roller light × roller length φ600 × 700 (mm)

2, gear box

3, DC motor: Z4-200-41 75KW one Z4-180-41 45KW one

4, roller surface coating material: neoprene.

上一页:Hydraulic station
下一页:1000 wide four rolling mill
    
香蕉app安卓http://81111113.com.cn/网站地图香蕉app安卓html

随机关键词

:小蝌蚪app 下载安卓版,荔枝影院男人影院,爸爸新婚夜爬上我的床,类似炮炮视频app下载,小蝌蚪app播放器下载,刺激伊在人线香蕉观看,橙子视频官网,少年阿兵宾全文阅目录,女儿用身体诱惑爸爸,香蕉视频app污下载,茄子视频app,丈母娘肥水真多,阿宾全文目录阅读在线,猫咪视频官网,日本黄片app有哪些

最新更新内容随机展示


www.saow.net|ahyqwfkl.cn天津渤海轻工投资集团有限公司原党委书记、董事长邢连华接受审查调查黄河水利职业技术学院团委荣获“全国五四红旗团委”称号埃及海军练抢滩登陆!美俄法德武器“同框”XINHUA Português民营银行2019年净利润暴涨 苏宁银行同比增超20倍我国已建成5G基站19.8万个 套餐用户规模超5000万芝商所调整规则!原油期货后,天然气也会跌至负值吗?教授变身“带货主播”,进行网上“云销售”英媒:女性就业助推英国就业率创新高中国抗疫医疗专家组走访菲华社会最大医院并现场交流指导国家能源局—派出机构动态吉林省政府最新任免一批干部China's Pilot Free Trade Zones investinchina.chinadaily.com.cn这个.. 页面没有找到!!!疫情防控需“硬核”,提升营商环境也需“硬核”